To Örebro University

oru.seÖrebro universitets publikasjoner
Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Utsortering av avvikande stänger
Örebro universitet, Institutionen för naturvetenskap och teknik.
2018 (svensk)Independent thesis Basic level (professional degree), 10 poäng / 15 hpOppgaveAlternativ tittel
How to sort out undesired bars (engelsk)
Abstract [sv]

Projektet har utförts i samarbete med Ovako Hällefors. Närmare bestämt deras mediumvalsverk. Efter att stängerna valsats till önskad dimension, svalnar de en tid för att sedan klippas till önskad kundlängd. Efter klippning förs stängerna via en rullbana till fickor där de buntas. En del stänger är avvikande gällande längd och rakhet. I dagsläget sorteras de ut manuellt. En tidskrävande process då buntarna måste öppnas och de avvikande stängerna sorteras ut.

Företaget hade en önskan om att sortera ut dessa stänger redan i den befintliga produktionslinan. Projektet har undersökt och tagit fram två koncept på hur en lösning på problemet kan se ut.

En designprocess har legat till grund för projektet, innehållande: förstudie, analys, idégenerering och konceptframtagning. Där metoder så som deltagande observation, brainstorming, urvalsmatriser och dimensionering varit av stor vikt.

Projektet resulterade i två stycken koncept, ett baserat på processutveckling och ett på produktutveckling.

Abstract [en]

The project has been carried out at Ovako Hällefors. More specifically, their medium-rolling mill. After the bars are rolled to the desired dimension, they cool down for a time and then they get cut to the desired customer length. After cutting, the bars are transported to pockets where they are bundled. Some bars differ in length and level of straightness. Currently, they are sorted out manually. A time-consuming process since the bundles must be opened and the bars that differ are sorted out.

The company had the desire to sort these bars out already in the existing production line. The project has investigated and developed two concepts on how a solution to the problem may look.

A design process has laid the foundation for the project, including: preliminary study, analysis, idea generation and conceptualization. Where methods such as participant observation, brainstorming, selection matrices and calculating dimension has played a key role.

The project resulted in two concepts, one based on process development and one product development.

sted, utgiver, år, opplag, sider
2018. , s. 37
Emneord [en]
product development, preliminary study, idea generation, dimensioning
Emneord [sv]
Produktutveckling, förstudie, idégenerering, dimensionering
HSV kategori
Identifikatorer
URN: urn:nbn:se:oru:diva-71053OAI: oai:DiVA.org:oru-71053DiVA, id: diva2:1274156
Fag / kurs
Mechanical Engineering
Veileder
Examiner
Tilgjengelig fra: 2018-12-28 Laget: 2018-12-28 Sist oppdatert: 2018-12-28bibliografisk kontrollert

Open Access i DiVA

Fulltekst mangler i DiVA

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric

urn-nbn
Totalt: 85 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf