oru.sePublikasjoner
Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Förbättringsarbete inom verkstadsindustrin
Örebro universitet, Institutionen för naturvetenskap och teknik.
Örebro universitet, Institutionen för naturvetenskap och teknik.
2012 (svensk)Independent thesis Basic level (professional degree), 10 poäng / 15 hpOppgaveAlternativ tittel
IMPROVEMENTS IN INDUSTRIAL MANUFACTURING (engelsk)
Abstract [sv]

Detta examensarbete har utförts på Örebro Svets och Hydraulik, vidare benämnt ÖSH. Företaget tillverkar svetsade stålkonstruktioner med inriktning öppna och slutna kärl. Svårigheter att nå kunders krav och önskemål gällande kvalitet och leveransprecision visar sig i antalet reklamationer och försenade leveranser. Syftet med arbetet var att analysera nuläget och ge förslag på metoder, verktyg och förbättringsmöjligheter inom ÖSH:s kvalitetsarbete, för att på sikt kunna öka kvalitet och förbättra leveransprecision.

Nulägesanalysen visade stora brister inom ÖSH:s arbete med kvalitet och kvalitetssäkring. Tidigare införda metoder och verktyg har till en början givit goda resultat men med tiden har arbetet med dessa fallerat. På grund av detta föreslogs inga nya metoder utan fokus lades på att ge rekommendationer i det fortsatta arbetet med kvalitet.

Abstract [en]

This thesis has been carried out at Örebro Svets och Hydraulik, further named ÖSH. The company manufactures welded steel constructions with a focus on different types of tanks.

The company’s main difficulty is to reach their client’s demands and requirements for quality and delivery precision, this issue was reflected in the number of complaints and late deliveries. The main purpose of this study was to analyze the work process and to make suggestions on methods, tools and other opportunities for improvement in ÖSH’s quality work, in order to eventually increase quality and improve delivery performance. The analysis of the company’s current work process revealed significant gaps in ÖSH’s work on quality and quality assurance. Previously introduced improvement projects have shown good results, but over time, due to lack of commitment these projects were taken of the list of priorities. Because of this problem, analysis results do not suggest the implementation of new methods or tools, instead ÖSH have been given suggestions for improvements in different aspects of their production.

sted, utgiver, år, opplag, sider
2012. , s. 69
Emneord [sv]
Förbättringsarbete
HSV kategori
Identifikatorer
URN: urn:nbn:se:oru:diva-23644OAI: oai:DiVA.org:oru-23644DiVA, id: diva2:536072
Fag / kurs
Mechanical Engineering
Uppsök
Technology
Tilgjengelig fra: 2012-08-15 Laget: 2012-06-21 Sist oppdatert: 2017-10-17bibliografisk kontrollert

Open Access i DiVA

Fulltekst mangler i DiVA

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric

urn-nbn
Totalt: 189 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf