To Örebro University

oru.seÖrebro universitets publikasjoner
Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Reducera omställningstiden i ytmonteringslinan Panasonic på Stoneridge Electronics AB
Örebro universitet, Institutionen för naturvetenskap och teknik.
2014 (svensk)Independent thesis Basic level (professional degree), 10 poäng / 15 hpOppgaveAlternativ tittel
Reduce Changeover Time in Panasonic SMT-line at Stoneridge Electronics AB (engelsk)
Abstract [sv]

Omställningstiden i ytmonteringslinan Panasonic på Stoneridge Electronics AB ansågs vara en bidragande orsak till att maskinernas fulla kapacitet inte kunde utnyttjas. Syftet med det här examensarbetet var därför att analysera omställningssituationen och med analysen som grund reducera omställningstiden med hjälp av SMED-metoden samt ta fram förbättringsförslag gällande arbetet i övrigt.

Förutom SMED har tidsmätningar, observationer samt litteraturstudier legat till grund för reduceringen av omställningstid samt förbättringsförslagen som innebär bl.a. sekventiell omställning av conveyersystemet i ytmonteringslinan samt tydligare instruktioner och mer visuell styrning, enligt teorin om Lean.

Ett fortsatt arbete i form av uppdatering av arbetsinstruktioner och själva utförandet av omställningen är exempel på typen av ständiga förbättringar som företaget redan idag jobbar aktivt med.

Abstract [en]

The changeover time in Panasonic SMT-line at Stoneridge Electronics AB was considered a contributing reason to that the machine's full potential could not be utilized. The aim of this thesis was to analyze the changeover situation and with the analysis as a basis reduce changeover time using the SMED method and develop improvement suggestions regarding the work in general.

Besides SMED has time measurements, observations and literature studies formed the basis for the reduction of changeover time and for the improvement suggestions, including sequential conversion of the conveyer system in the SMT-line and also clearer instructions and more visual control, according to the theory of Lean.

Further work like updating work instructions and the actual execution of the conversion is an example of the type of continuous improvement as the company is already familiar with.

sted, utgiver, år, opplag, sider
2014. , s. 33
Emneord [sv]
omställning, ställtid, SMED, montering
HSV kategori
Identifikatorer
URN: urn:nbn:se:oru:diva-35500OAI: oai:DiVA.org:oru-35500DiVA, id: diva2:729004
Fag / kurs
Mechanical Engineering
Veileder
Examiner
Tilgjengelig fra: 2014-06-25 Laget: 2014-06-25 Sist oppdatert: 2017-10-17bibliografisk kontrollert

Open Access i DiVA

fulltext(1191 kB)535 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 1191 kBChecksum SHA-512
4113dc143a2d9c9a82d18e7638775c045a5a494baf600aae576db3aaa7534399e2be5ded96dc0dba101f373680de59c6e4c70dc258ea50d0c5e25aa15d5f8844
Type fulltextMimetype application/pdf

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 535 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 450 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf