oru.sePublikationer
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
GRANSKNINGSPROCESSEN I EN MODELLBASERAD PROJEKTERING - Att utveckla granskningsprocessen av vägmodeller i 3D på ett företag i Örebro
Örebro University, School of Science and Technology.
Örebro University, School of Science and Technology.
2017 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
THE REVIEW PROCESS IN A MODEL-BASED DESIGN To develop the review process of road models in 3D at a company in Örebro (English)
Abstract [sv]

Utvecklingen från 2D-projektering till 3D-projektering inom byggbranschen är något som har pågått ett tag. Tidigare har pappersritningar i 2D skrivits ut för att sedan levereras till kund efter granskning. Det blir allt vanligare att kunden inte vill ha några ritningar levererade till sig utan enbart 3D-modellen. I stora projekt blir det oftast en billigare projektering utan ritningar och om byggentreprenören använder sig av maskinstyrning behövs ibland inga ritningar. Projektören behöver då enbart granska 3D-modellen i 3D-programmet.Syftet med detta arbete på WSP (väg, gata, mark) i Örebro var att utveckla granskningsprocessen av vägmodeller i programmet Civil 3D. Tillsammans med Skanska vill WSP i Örebro (väg, gata, mark) skapa en granskning som håller en högre kvalitet och som gör att arbetet i produktionen underlättas utan några onödiga problem.Underlaget till arbetet grundar sig på litteratursökning på internet samt litteratur från Örebro Universitetsbibliotek, information från WSP och intervjuer med personer som jobbar på WSP, Skanska och Trafikverket.Examensarbetet resulterade i följande: Ett förbättrat arbetssätt som enkelt går att följa En förbättrad checklista som är kort men ändå innehållsrik En förklarande mall till checklistan som gör den lätt att följa En checklista anpassad till entreprenören (Skanska) Förslag på förbättringar i framtiden.Det här examensarbetet har utvecklat granskningsprocessen av vägmodeller i Civil 3D på WSP i Örebro (väg, gata, mark). Ett mer omfattande arbete med fler entreprenörer och ytterligare kontor skulle vara intressant att göra.

Abstract [en]

The development from 2D design to 3D design in the construction industry is something that has been going on for a while. The most common way was earlier to print drawings in 2D, before being delivered to the customer after review. Nowadays it’s becoming more common that the customer doesn’t want any drawings delivered to him, only the 3D model. In large projects is it usually a cheaper design without drawings and if the entrepreneur uses machine control sometimes no drawings are required. The projector only needs to review the 3D model in the 3D program.The purpose of this degree project at WSP (road, street, land) in Örebro was to develop the review process of road models in the program Civil 3D. Together with Skanska, WSP in Örebro (road, street, land) wants to create a higher quality of reviewing and making the work in production easier without any unnecessary problems.The basis of the work is based on literature search on the internet and literature from Örebro University Library, information from WSP and interviews with people working at WSP, Skanska and the Swedish Transport Administration (Trafikverket).This degree project resulted in the following: An improved way of working that is easy to follow  An improved checklist that is short but still content rich  An explanatory template for the checklist that makes it easy to follow  A checklist adapted to the entrepreneurs (Skanska)  Proposals for improvements in the futureThis degree project has developed the review process of road models in Civil 3D at WSP in Örebro (road, street, land). A more extensive work with more entrepreneurs and several offices would be interesting to do.

Place, publisher, year, edition, pages
2017. , 66 p.
Keyword [en]
Review process, checklist, way of working, road model, 3D model
Keyword [sv]
Granskningsprocess, checklista, arbetssätt, vägmodell, 3D-modell
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:oru:diva-58506OAI: oai:DiVA.org:oru-58506DiVA: diva2:1118919
Subject / course
Construction Engineering
Supervisors
Examiners
Available from: 2017-07-03 Created: 2017-07-03 Last updated: 2017-10-18Bibliographically approved

Open Access in DiVA

No full text

By organisation
School of Science and Technology
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 16 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf