oru.sePublikationer
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Visuell planering produktion: Utvärdering av visuella planeringen i produktionen
Örebro University, School of Science and Technology.
Örebro University, School of Science and Technology.
2017 (Swedish)Independent thesis Advanced level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Visual Planning Production : - Evaluation of visual planning in production (English)
Abstract [sv]

Detta arbete har utförts i samarbete med Peab Örebro och Peab Västerås i syfte undersöka planeringsverktyget Visuell Planering Produktion (VPP). Under ett tidsintervall på två månader har verktygets nuvarande effektivitet och verkan i byggproduktionen undersökts. Den traditionella planeringsmetoden har sedan lång tid tillbaka varit en komplex del av byggproduktionen. Den visuella planeringen inom produktionen en framtida kandidat till den kulturförändring branschen har väntat på. Genom visualiseringar och ökade/effektivare mötesfrekvenser hämtar VPP inspiration från det världskända Toyota konceptet. Toyota Production System (TPS), de utmanade bilindustrin i mitten av 1900-talet och orsakade stora kulturförändringar med nytänkande metoder och verktyg.

Arbetet omfattar undersökningar av förbättringsmöjligheter, huruvida verktyget förbättrar byggproduktionen samt den viktigaste frågan: Är VPP värt att implementera som standardverktyg för planeringen av byggproduktionen. Undersökningsunderlag baseras utifrån litteraturstudier, observationer, intervjuer och enkätstudier som utförts i takt med arbetets gång på byggarbetsplatserna. Undersökningar och intervjuer genomfördes inom produktionen, sammanlagt intervjuades 14 personer med varierande befattningar och roller samt 14 deltagare under två enkätstudier, genomförda med en månads intervall.

Arbetet resulterade i en majoritet av positiv respons, planeringsmetoden VPP bidrar till effektivare möten och bättre informationsflöde orsakat av ökad kommunikation på arbetsplatsen. Verktyget anses vara ett bra koncept att implementera som standard med möjligheter till fortsatt utveckling.

Abstract [en]

This degree project has been carried out in collaboration with Peab Örebro and Peab Västerås with the purpose of exploring the planning tool Visual Planning Production (VPP). Over a period of two months, the tool's current efficiency and impact on the construction has been investigated. The constructional work has long been a complex part of traditional planning methodology. Visual planning in production is a future candidate for the cultural change the industry has been waiting for. Through visualizations and enhanced / efficient meeting rates, VPP brings inspiration from the world-renowned Toyota concept Toyota Production System (TPS), challenging the automotive industry in the mid-20th century, causing major cultural changes with innovative methods and tools. This project involves investigations of improvement possibilities, whether it improves the constructional work and the most critical issue Is VPP worth using as a standard tool for the planning of the production. Examination data are based on literature studies, observations, interviews and questionnaire studies carried out as work progresses at the construction sites. Studies and interviews were conducted within the production. In total 14 people were interviewed with various positions and roles, 14 participants during two questionnaire studies conducted at a monthly interval. The work resulted in much of positive response, the VPP planning method contributes to more effective meetings and better information flow due to increased communication at the workplace. The tool is considered a valuable concept to implement as standard with opportunities for further development.

Place, publisher, year, edition, pages
2017. , 100 p.
Keyword [en]
Construction, VP, VPP, Lean, Planning
Keyword [sv]
Byggproduktion, VP, VPP, Lean, Planering
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:oru:diva-59442OAI: oai:DiVA.org:oru-59442DiVA: diva2:1137838
Subject / course
Construction Engineering
Supervisors
Examiners
Available from: 2017-09-01 Created: 2017-09-01 Last updated: 2017-09-01Bibliographically approved

Open Access in DiVA

No full text

By organisation
School of Science and Technology
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar

Total: 3 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf