oru.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Analys av driftstopp i ett hyvleri
Örebro University, School of Science and Technology.
Örebro University, School of Science and Technology.
2017 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Analysis of stoppage in a planing mill (English)
Abstract [sv]

Moelven är en av Skandinaviens största trämekaniska koncerner med 52 operativa enheter i Norge, Sverige och Danmark. Denna studie har utförts i hyvlerianläggningen hos Moelven Valåsen Wood AB som är ett hyvleri och vidareförädling av byggvirke beläget i Karlskoga.

Problemet grundar sig i att Moelven vill öka utnyttjandegraden i hyvlerianläggningen. Denna ligger idag på ca 65% och hyvleriet begränsar därför en stor del av materialflödet. Syftet med denna fallstudie var att undersöka vilka orsaker som ligger bakom den låga utnyttjandegraden för att ge förslag på åtgärder till dessa.

Studien inleddes med ett brett perspektiv för att kunna undersöka de verkliga orsakerna till problemet. En analys gjordes av de olika stopporsakerna för att klargöra vilka olika stopp som uppstår samt hur stor del av den totala stopptiden de utgör. Vidare gjordes avgränsningar som innebar en fördjupning inom omställningsprocessen då omställningar av hyveln utgjorde 30% av den totala stopptiden under tidsperioden. För att kunna analysera denna process gjordes videoinspelningar där de olika arbetsmomenten definierades och tidsattes. Då fräsbyten var de omställningar som observerades flest antal gånger utformades konkreta förbättringsförslag främst för dessa. Moelven får även underlag för att kunna gå vidare med de övriga omställningarna.

Fallstudien resulterade i olika förbättringsförslag som främst syftade till att effektivisera omställningarna. Dessa förslag innebar:

• Separera externa och interna aktiviteter, såsom att förbereda verktyg inför omställningen.

• Använda verktygsvagnar för att eliminera rörelser i så stor utsträckning som möjligt.

• Skapa bättre ordning på verktyg genom att utforma en check table.

Standardisering av arbetsmoment genom att skapa en rutinbeskrivning samt dela upp  operatörerna i olika arbetsroller.

Involvera alla i organisationen för att kunna arbeta med ständiga förbättringar.

En simulering gjordes genom att implementera delar av förbättringsförslaget vilken medförde en ställtidsreducering om 32.5% för fräsbyte. Då en stor gemensam faktor för alla typer av omställningar är rörelser, vilket förbättringsförslaget syftar till att reducera kan det antas vara generaliserbart för övriga omställningar.

Abstract [en]

Moelven is an industrial group that produces building materials and systems for the construction industry; with its 52 productions units in Norway, Sweden and Denmark, it is one of the biggest in Scandinavia. This study has been carried out in the planing mill at Moelven Valåsen Wood AB in Karlskoga.

Because of the low utilization rate in the planing mill (65%), it constitutes a bottleneck, meaning it limits the capacity and flow of material, for most of the products. The purpose of the study was to analyze the stoppage in the planing mill in order to make recommendations on how the utilization rate can be increased.

The study began with a wide perspective to identify the reasons behind this problem. A summary of all stops in the planing mill concluded that set ups of the planer made up for 30% of total stoppage. Because of this, the study was narrowed down to mainly analyze the different types of set ups, which was done through extensive observations and videotaping. The solutions and recommendations that were given are therefore almost entirely regarding set up-time reduction, and more specifically, milling set ups. The recommendations, based on the results of the study, includes:

• Suggestions on how to separate internal and external set up.

• Better order of tools through designing a check table.

Standardizing the procedure by creating a routine and dividing the operators into different work roles.

Involving everyone in the organization in order to work with continuous improvement.

A simulation of milling set ups was done by implementing parts of the recommendations – this resulted in a setup up-time reduction of 13 minutes, which corresponds to 32.5%. Because of common denominators, such as movements, the recommendations given are likely generalizable for all set ups.

Place, publisher, year, edition, pages
2017. , p. 69
Keyword [en]
set up time, bottleneck, stoppage, planing mill
Keyword [sv]
ställtidsreducering, flaskhals, driftstopp, hyvleri
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:oru:diva-61892OAI: oai:DiVA.org:oru-61892DiVA, id: diva2:1150642
Subject / course
Mechanical Engineering
Supervisors
Examiners
Available from: 2017-10-19 Created: 2017-10-19 Last updated: 2017-10-19Bibliographically approved

Open Access in DiVA

Analys av driftstopp i ett hyvleri(9542 kB)62 downloads
File information
File name FULLTEXT01.pdfFile size 9542 kBChecksum SHA-512
fcad467ee4052792cdc0185f0ae1529cf724ac7378406dd21c986a5a512304e177a59b757f662c65e43a53ffae24c11694103ee7d2cb64f2070543a7212b1229
Type fulltextMimetype application/pdf

By organisation
School of Science and Technology
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 62 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 669 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf