oru.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Förbättringsarbete inom verkstadsindustrin
Örebro University, School of Science and Technology.
Örebro University, School of Science and Technology.
2012 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
IMPROVEMENTS IN INDUSTRIAL MANUFACTURING (English)
Abstract [sv]

Detta examensarbete har utförts på Örebro Svets och Hydraulik, vidare benämnt ÖSH. Företaget tillverkar svetsade stålkonstruktioner med inriktning öppna och slutna kärl. Svårigheter att nå kunders krav och önskemål gällande kvalitet och leveransprecision visar sig i antalet reklamationer och försenade leveranser. Syftet med arbetet var att analysera nuläget och ge förslag på metoder, verktyg och förbättringsmöjligheter inom ÖSH:s kvalitetsarbete, för att på sikt kunna öka kvalitet och förbättra leveransprecision.

Nulägesanalysen visade stora brister inom ÖSH:s arbete med kvalitet och kvalitetssäkring. Tidigare införda metoder och verktyg har till en början givit goda resultat men med tiden har arbetet med dessa fallerat. På grund av detta föreslogs inga nya metoder utan fokus lades på att ge rekommendationer i det fortsatta arbetet med kvalitet.

Abstract [en]

This thesis has been carried out at Örebro Svets och Hydraulik, further named ÖSH. The company manufactures welded steel constructions with a focus on different types of tanks.

The company’s main difficulty is to reach their client’s demands and requirements for quality and delivery precision, this issue was reflected in the number of complaints and late deliveries. The main purpose of this study was to analyze the work process and to make suggestions on methods, tools and other opportunities for improvement in ÖSH’s quality work, in order to eventually increase quality and improve delivery performance. The analysis of the company’s current work process revealed significant gaps in ÖSH’s work on quality and quality assurance. Previously introduced improvement projects have shown good results, but over time, due to lack of commitment these projects were taken of the list of priorities. Because of this problem, analysis results do not suggest the implementation of new methods or tools, instead ÖSH have been given suggestions for improvements in different aspects of their production.

Place, publisher, year, edition, pages
2012. , p. 69
Keywords [sv]
Förbättringsarbete
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:oru:diva-23644OAI: oai:DiVA.org:oru-23644DiVA, id: diva2:536072
Subject / course
Mechanical Engineering
Uppsok
Technology
Available from: 2012-08-15 Created: 2012-06-21 Last updated: 2017-10-17Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
School of Science and Technology
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 180 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf