oru.sePublikationer
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
SETUP TIME OPTIMIZATION
Örebro University, School of Science and Technology, Örebro University, Sweden.
Örebro University, School of Science and Technology, Örebro University, Sweden.
2012 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Sammanfattning

 

Emhart Glass AB är världsledande företag inom glasflasktillverkning. De konstruerar automatiserade maskiner som formar glasflaskor. I Sverige finns det två fabriker, en i Örebro och en i Sundsvall. I Örebro tillverkar man främst reservdelar och nya delar till maskinerna medan man i Sundsvall monterar ihop maskinerna. Det finns totalt 15 olika fabriker och kontor över världen med huvudkontor i schweiziska Cham.   

 

Eftersom Emhart Glass Örebro har för långa ställtider på några av deras maskiner ska det undersökas hur omställningsarbetet går till i dagsläget och hur omställningsarbetet skiljer sig åt mellan operatörerna. Det ska även undersökas om det finns några möjligheter till förbättringar samt om det i dagsläget finns något standardiserat sätt som operatören borde följa. Ett dokument som beskriver hur ställarbetet ska gå till kommer även att tas fram.

 

Ett utmärkt verktyg för att förkorta ställtiderna i en produktion är SMED-Metoden. Filosofin bakom SMED är att man ska analysera och skilja på inre och yttre ställ. Med inre och yttre ställ menas de som endast kan utföras då maskinen är avstängd resp. de som kan utföras när maskinen är i drift.

 

För att standardisera omställningsarbetet så att samtliga operatörer jobbar på liknande sätt så krävs det att man tar fram en dokumentation över hur arbetet ska gå till. Därför har checklistor tagits fram till operatören. "Checklista - Omställning.xls" är en checklista med syftet att man ska kunna bocka för vilka delar i förberedelserna man gjort inför kommande ställ. Den har tagits fram för att man enkelt ska kunna hålla reda på vilka delar man gjort om man blivit tvungen att jobba med maskinen emellan förberedelserna eller om man slutar sitt skift och lämnar delar av arbetet till nästa operatör.

 

Om samtliga av dessa förbättringar införs kan man förvänta sig en ställtidsreducering på 20,5% vilket motsvarar ca 35min per ställ. Ignorerar man inkörningstiderna och endast kollar på riggningstider kan man se en förbättring på 36,4 %.

Abstract [en]

Abstract

 

Emhart Glass Ltd is a world leader in glass bottle manufacturing. They design automated machines that shape glass bottles. In Sweden there are two factories, one in Örebro and one in Sundsvall. In Örebro they manufacture primarily spare parts and new parts for the machines while they in Sundsvall assemble the machines. There are a total of 15 factories and offices around the world with the headquarter located in Swiss Cham.Since Emhart Glass Örebro has long setup times on some of their machines. This is why we want to identify the current setup process and how the setup process differs between operators. We will also look at whether there are any opportunities for improvement to be made and if they have a standardized way to work. A document that describes how to setup work should be done will also be developed.An excellent tool to shorten the setup time in a production is the SMED method. The philosophy behind SMED is that you should analyze and separate the inner and outer activities. Inner and outer activities mean those activities which can only be performed when the machine is turned off, respectively those activities that can be performed when the machine is in operation.

In order to standardize the adjustment process so that all operators are working in a similar way it's required that you make a documentation about how the work should be done. Therefore, checklists been developed to the operator. "Checklista - Omställning.xls" is a checklist with the purpose to be able to check which parts of the preparations they have made before the next setup work. It has been designed to be easy to keep track of what parts you have done if you had to work with the machine between the trial or if you quit your shift and leaving parts of the work to the next operator.

If all of these improvements are implemented, we expect a set-up time reduction of 20.5% which corresponds to about 35min per set-up. By ignoring the running time and only check on the setup times, one can see an improvement of 36.4%.

Place, publisher, year, edition, pages
2012.
Keyword [en]
setup, set, up, time, optimization, optimisation, analysis, SMED
Keyword [sv]
ställ, ställtid, inre, yttre, optimering, analys, SMED
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:oru:diva-23661OAI: oai:DiVA.org:oru-23661DiVA: diva2:536256
Subject / course
Mechanical Engineering
Uppsok
Technology
Supervisors
Examiners
Available from: 2012-08-21 Created: 2012-06-21 Last updated: 2012-08-21Bibliographically approved

Open Access in DiVA

fulltext(1681 kB)602 downloads
File information
File name FULLTEXT01.pdfFile size 1681 kBChecksum SHA-512
7c24abe0748248744cacb497181558fddb0c5e58b1d18164b8b427e2a37fa8420e4538663631730d6dba0fba4b46711b6d40d474456dc95b05e2838983353e28
Type fulltextMimetype application/pdf
Bilagor(1131 kB)46 downloads
File information
File name ATTACHMENT01.zipFile size 1131 kBChecksum SHA-512
a15c7e26f252668183ed66179ecb4230e5d998cbef4c8485b507c09ea45bc46058eae7c9a885c3bd625e12f315dbafead3360d0e9d8939e27e936ddfd468ab2b
Type attachmentMimetype application/zip

By organisation
School of Science and Technology, Örebro University, Sweden
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 602 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 357 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf