oru.sePublikationer
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Det vore ju skam om det inte fungerade bättre – En fallstudie förfelsökning av projekteringsprocessen
Örebro University, School of Science and Technology, Örebro University, Sweden.
Örebro University, School of Science and Technology, Örebro University, Sweden.
2014 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
It would be a shame if itdidn´t work better - A case study regarding errors in the design process (English)
Abstract [sv]

Den här rapporten redovisar resultatet av en fallstudie på projektet Göingegården som genomförs i

regi av Derome Mark & Bostad. Syftet med rapporten är att kartlägga arbetsprocessen och därefter

belysa var det finns felkällor och störst förbättringsmöjligheter, av vilken anledning samt vilka

konsekvenser som dessa får. Rapporten belyser och åskådliggör vilka åtgärder och lösningar som bör

användas och dessa åtgärder utvärderas ur ett LEAN perspektiv med fokus på tid och kostnad som

effekter.

För att kunna nå dit har en stor del av arbetet inriktats sig mot att förstå hur processen fungerar, hur

arbetet ser ut på Derome samt synliggöra vilka avvikningar som finns och hur dessa utspelar sig i det

långa loppet. Arbetet med eftersökning och felsökning består av främst av möten, intervjuer och

eftersökningar om hur arbetet sker på andra företag i samma bransch.

Dessa avvikelser analyserades och deras härkomst, varför de uppkommer, undersöktes och fokus låg

på att hitta förbättringspunkter som är återkommande och inte bara engångsproblem. Att

grundstenarna och visionerna som finns i LEAN är tätt sammanknutna med de åtgärdsförslag som

redovisas i rapporten ser vi som en klar utgångspunkt.

Resultatet av rapporten visar på att inom projekteringsdelen av projektet finns det brister och de

flesta av dessa brister härleds komma från omodern teknik. Byggbranschen genomgår för närvarande

en modernisering gällande teknik och arbetsmetoder och det gäller för främst mellanstora företag

som Derome att hänga med i utvecklingen och inte hamna bakom. De förslag som lagts fram i

rapporten som åtgärder är just relativt ny men beprövad teknik som utgår från ett LEAN-tänk och

som var för sig löser flertalet av uppkomna problem. Åtgärderna för att förbättra processen kräver

ledningens engagemang, utbildning av personal och investeringar i olika former. Vi ser att fördelarna

på olika plan klart överväger den belastning och kostnad som krävs.

Abstract [en]

This report present the results of a case study on the project Göingegården rendered on directed by

Derome Mark & Bostad. The report aims to identify the work process, and then highlight where there

are sources of error and the greatest opportunities for improvement, for what reason and what

consequences these may be. The report highlights and illustrates the measures and practices that

should be used and these measures assessed from a Lean perspective, focusing on time and cost

effects.

In order to achieve this, a large part of the work focused towards understanding how the process

works, how the work is done at Derome and visualize the deviations that exist and how they play out

in the long run. The efforts to search and troubleshoot consist mainly of meetings, interviews and

studies of how work is done at other companies in the same industry.

These deviations are analyzed and their origins, why it occurs, sought and the focus was on finding

improvement points that are recurrent and not just one-off problem. The fundamentals and visions

found in LEAN are closely interwoven with the action proposed by the report, and that is a clear basis

for the report.

The results of the report show that the planning phase of the project, there are weaknesses and

most of these defects are derived and come from outdated technology. The construction industry is

currently undergoing a modernization regarding technologies and work methods and it is most

relevant for medium large companies such as Derome to keep up with developments and not fall

behind. The proposals put forward in the report is actions that is just relatively new but proven

technology that is based on a LEAN mindset and each of which solves most of the resulting

improvement points or defects. Measures to improve the process require management

commitment, staff education and investment in various forms, but we see that the benefits at

different levels clearly outweigh the burden and expense required.

Place, publisher, year, edition, pages
2014. , 76 p.
Keyword [en]
Lean, Building process, Streamlining, BIM, Improvement measures
Keyword [sv]
LEAN, Byggprocessen, Effektivisering, BIM, Förbättringsåtgärder
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:oru:diva-37215OAI: oai:DiVA.org:oru-37215DiVA: diva2:750463
Subject / course
Construction Engineering
Supervisors
Examiners
Available from: 2014-09-29 Created: 2014-09-29 Last updated: 2014-09-29Bibliographically approved

Open Access in DiVA

fulltext(4193 kB)229 downloads
File information
File name FULLTEXT01.pdfFile size 4193 kBChecksum SHA-512
94a5a53da26ce87779a74d2576e8921021cb1a590e32963e1dff82e18074fb8465378e13334d0583cc71762fd04e264d6e55fa1f759ca28fe8a2099404b47029
Type fulltextMimetype application/pdf

By organisation
School of Science and Technology, Örebro University, Sweden
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 229 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 488 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf