oru.sePublikationer
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Visualisering av respektive stations takttid på en specifik monteringsbana på GKN Driveline i Köping AB
Örebro University, School of Science and Technology, Örebro University, Sweden.
Örebro University, School of Science and Technology, Örebro University, Sweden.
2015 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Visualization of the Rate of each Station at a Specific Assemblyline at GKN Driveline Koping AB (English)
Abstract [sv]

Examensarbetet utfördes på monteringsavdelningen på GKN Driveline AB i Köping där slut-och vinkelväxlar monteras och sedan förses till globala kunder inom personbilsindustrin.

Den totala takttiden för den monteringsbana som detta projekt innefattade är 64 sekunder, men i dagsläget blir den totala takttiden ofta högre. Problemet är att det inte går att se om montören taktar rätt eller inte på respektive monteringsstation, vilket resulterar i att det inte går att identifiera var någonstans på banan tidsförlusten sker och var rotorsaken ligger vid en för lång takttid, då det inte finns någon indikator på detta.

Syftet med detta projekt var att ta fram en lösning på en visualisering som gör att montören kan se takttiden på respektive station. För-och nackdelar med en visualisering analyserades, utvärderades och presenterades och även en övergripande kostnadskalkyl togs fram. Den skriftliga rapporten fungerar som ett underlag för en eventuell implementering.

Till grund för examensarbetet stod litteraturstudier inom områdena Lean och stress, extern benchmarking för insamling av information och inspiration samt intervjuer med anställda på GKN Driveline för att lyfta fram åsikter och tankar om en eventuell visualiserings påverkan på människan. Utöver informationsinsamlingen ovan genomfördes en egen metod för framtagning av den slutliga lösningen.

Lösningen som togs fram var en tilläggsprodukt till företagets redan befintliga industrisystem. Produkten visualiserar takttiden för montören samt registrerar och lagrar data, vilket medför flera olika fördelar. Diskussion om hur visualiseringen ska bli så effektiv som möjligt tillsammans med slutliga rekommendationer har lagts fram och om implementeringen genomförs och medför förbättrat produktionsresultat kan visualiseringen med fördel appliceras på samtliga monteringsbanor på företaget.

Abstract [en]

The thesis was performed on the department of assembling at GKN Driveline AB in Koping, where final- and bevel gear is assembled and then provided to global customers in the car industry.

The total rate for the assembly line which this project included is 64 seconds, but in the current situation the total rate is often higher. The problem is that it’s not possible to see if the assembler tact right or not on each assembly station, resulting in that it’s not possible to identify where on the line the time loss occurs and where the root cause lies in a rate that’s too high, when there’s no indicator on that.

The aim of this project was to produce a solution that makes it possible for the assembler to see the rate on each station. Advantages and disadvantages with a visualization was analyzed, evaluated and presented, and an overall cost estimate was also produced. The written report works as a foundation for a possible future implementation.

The basis of the thesis were literature studies in the areas of Lean production and stress, external benchmarking to collect information and inspiration, and also interviews with the employees at GKN Driveline to highlight the views and thoughts on a possible effect of a visualization on humans. In addition to the collecting of the different information above a proprietary method for the production of the final solution was implemented.

The final solution that was produced was an enhancement to the company’s already existing industrial system. The product visualizes the rate for the assembler and records and stores data which entails several advantages. A discussion about how the visualization will be as efficient as possible together with final recommendations have been presented and if the implementation is carried out and improves the production result the visualization can be usefully applied to all the company’s assembly lines.

Place, publisher, year, edition, pages
2015.
Keyword [sv]
produktion, lean, 5S, visualisering, takttid, flöde
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:oru:diva-45450OAI: oai:DiVA.org:oru-45450DiVA: diva2:844212
Subject / course
Mechanical Engineering
Supervisors
Examiners
Available from: 2015-08-04 Created: 2015-08-04 Last updated: 2015-08-04Bibliographically approved

Open Access in DiVA

fulltext(1562 kB)125 downloads
File information
File name FULLTEXT01.pdfFile size 1562 kBChecksum SHA-512
298b14a8834ff749ad2869a37ed0e5ee7f2dbf94b042b2f2c78db86889f6026bb17058dd0649131c1cd01ed2e77efebd20a6feea8543971cb1312cc49c97b324
Type fulltextMimetype application/pdf

By organisation
School of Science and Technology, Örebro University, Sweden
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 125 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 327 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf