oru.sePublikationer
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Simulering och optimering av produktionsflöde balningslinje
Örebro University, School of Science and Technology, Örebro University, Sweden.
2015 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Simulation and Optimisation of Production-flow Balingline (English)
Abstract [sv]

BillerudKorsnäs har gjort en satsning på sin anläggning i Rockhammar då produktionen utökas genom flertalet utbyggnationer av den existerande anläggningen. En del av anläggningen som byggs ut är balningslinjen, den del av produktionen där pappersmassa pressas till solida balar och paketeras i emballage. Målet med utbyggnationen av balningslinjen är att klara av att hantera den ökning i produktionsflödet som den utökade produktionsanläggningen bidrar med. Balningslinjen planeras att byggas ut i tre efterföljande steg och på så sätt suggestivt öka produktionskapaciteten.

Examensarbetets syfte var att ta fram simuleringsmodeller för den nya balningslinjen i det diskreta hybridsimuleringsprogrammet Plant Simulation och på så sätt uppskatta vilken produktionskapacitet anläggningen har efter ombyggnationen. Effekten av förändringarna analyserades genom att simulera olika scenarion i modeller baserade på de olika steg av utbyggnationer balningslinjen genomgår. Resultatenanalyseras för maskinbeläggningsgrad, produktionshastighet och flaskhalsar.

På BillerudKorsnäs Rockhammar har de inte tidigare använt sig av simuleringsstudier men var positivt inställda då de såg möjligheterna till att finna information som kan vara till hjälp i det arbete som pågår för att dimensionera och implementera den nya balningslinjen. Simuleringsstudier ger möjlighet att skapa förståelse för processer och är ett effektivt sätt att uppskatta beteendet hos anläggningar som inte ännu finns i verkligheten.

De metoder som använts för att skapa en nulägesanalys är intervjuer, historiska data, tidsstudier samt maskindata över de existerande komponenter som kommer att ingå i den nya anläggningen. Simuleringsmodellerna byggdes upp i små steg, där varje förändring testades och utvärderades innan nästa iteration av modellen. Modellvalidering var även en viktig del av examensarbetet då felaktiga indata äventyrade projektets giltighet.

Simuleringsstudierna visar att de kapacitetsmål företaget förväntade sig uppnå kommer att uppfyllas. Flaskhalsanalyser visar att det i viss mån finns möjlighet att uppnå en något högre kapacitet i anläggningen på bekostnad av en mer störningskänslig produktionsprocess. Den simuleringsmodell som tagits fram kan i framtiden användas för att testa förändringar i produktionsflödet på balningslinjen.

Abstract [en]

BillerudKorsnäs made an investment effort at their facility in Rockhammar, were there production capacity was to be increased by numerous constructions. One of those specifically is the expansion of the baling-line, a part of the production process were the pulp is pressed into bales and packaged. The purpose of the expansion of the baling-line is to manage the increased productionflow, generated by the overall expanded facility. The baling-line is to be expanded in three subsequent steps and thereby successively increase its production capacity.

The purpose of this thesis was to produce simulation models in the discrete hybrid simulation software Plant Simulation; thus approximate the production capacity after the expansion. The effect generated by these changes was approached by simulating different scenarios based upon the three steps the facility will be going through. The results was analyzed centered upon working percentage of the production resources and bottleneck analyses.

At BillerudKorsnäs Rockhammar there were no previous attempts at performing simulation studies. However, they withheld a positive attitude towards the notion, as they saw the possible benefits from gaining information that could be of use, during their ongoing undertaking in planning and dimensioning the new baling-line. As simulation studies makes it possible to acquire process knowledge and is regarded as an effective method to approximate the behavior of a facility that has not yet been implemented.

The situation analysis was performed by methods such as interviews, collecting historical production data, time studies and gathering machine specifications of the components that was to be transferred to the new facility. The simulation models was produced by small steps and verified through every iteration. Model validation stood out as an important part of the project, as inaccurate input data could jeopardize the projects validity.

The simulation studies indicated that the target production capacity, set by the company, was to be fulfilled. The bottleneck analysis specified that there was a margin for a slightly higher capacity; thought at the cost of a more susceptible production process. The simulation models produced during this thesis can be used for further test in changes of the production flow at the Rockhammar baling-line.

Place, publisher, year, edition, pages
2015.
Keyword [sv]
flödessimulering, plant simulation, lean, modellvalidering
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:oru:diva-45460OAI: oai:DiVA.org:oru-45460DiVA: diva2:844365
Subject / course
Mechanical Engineering
Supervisors
Examiners
Available from: 2015-08-05 Created: 2015-08-05 Last updated: 2015-08-05Bibliographically approved

Open Access in DiVA

fulltext(901 kB)79 downloads
File information
File name FULLTEXT01.pdfFile size 901 kBChecksum SHA-512
459b7fba887683d5b05c65cdb176509902b5381b240983caa2170db2e8874e51bbf79a3d006d6a42cec0da33c48b189d228893d82e1d9daa3895396e146a30a9
Type fulltextMimetype application/pdf

By organisation
School of Science and Technology, Örebro University, Sweden
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 79 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 172 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf