oru.sePublikationer
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Förbättringsarbete på monteringsavdelning
Örebro University, School of Science and Technology.
2015 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Efficiency of Assembly Section (English)
Abstract [sv]

Examensarbetet har utförts på Car-o-liner i Beijing. En monteringsavdelning som monterar mätsystem har behov av att reducera cykeltiden då de förväntas öka produktionen med 100%. Syftet med arbetet är att hitta förbättringsmöjligheter som kan reducera cykeltiden och förbättra montaget av mätsystemet. Examensarbetet är upprättat för att föreslå förbättringsåtgärder, inte för att genomföra dessa.

Under arbetets första fas har en nulägesanalys genomförts, stor vikt lades på att förstå hur arbetet utförs i nuläget. Under arbetets gång har förbättringsåtgärder med grund från bland annat lean utarbetats.

Det visade sig i nulägesanalysen att en kalibrering som varje enhet genomgår tar väldigt lång tid. Stor del av arbetet har därför ägnats åt att utreda rotorsaken till vilka svårigheter som finns vid kalibrering.

Arbetet resulterade i ett antal förbättringsåtgärder som har goda möjligheter att ge positiv inverkan. Bland annat ska förslagen kunna leda till följande resultat:

  •  Cykeltiden kan reduceras markant.
  •  En högre kvalitetsnivå kan uppnås.
  •  Lägre antal kalibreringsförsök.
  •  Reducerat antal reklamationer.
Abstract [en]

The thesis has been performed at Car-o-liner in Beijing. An assembly department that produces measuring systems has a need to reduce the cycle time as they are expecting increasing volumes of 100 %. The purpose of the work is to find improvement opportunities as well as improving the assembly of the measurement systems. The purpose of this thesis is to propose improvement actions, not to implement them.

During the first phase of the project a situation analysis was carried out, great attention was devoted to understanding how the work is done at present. During the time of the work, improvement actions with basis from lean have been elaborated.

The situation analyses showed that the calibration, which every unit goes through, takes a very long time. Hence, much of the work has been devoted to investigating the root causes for the difficulties in the calibration.

The thesis resulted in a number of improvements actions that have good opportunities to achieve positive impact. Among other things, the proposed actions could lead to the following results:

  •  Cycle time can be reduced by 6 hours.
  •  A higher quality can be ensured.
  •  Reduced number of calibration attempts.
  •  Less complaints from customers.
Place, publisher, year, edition, pages
2015.
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:oru:diva-45465OAI: oai:DiVA.org:oru-45465DiVA: diva2:844396
Subject / course
Mechanical Engineering
Supervisors
Examiners
Available from: 2015-08-05 Created: 2015-08-05 Last updated: 2017-10-17Bibliographically approved

Open Access in DiVA

No full text

By organisation
School of Science and Technology
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar

Total: 316 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf