oru.sePublikationer
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Specifikation av OP-tid (Operation Time)
Örebro University, School of Science and Technology.
2015 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Specifikation of Operation Time (English)
Abstract [sv]

Syftet med denna tekniska rapport är att undersöka olika metoder och verktyg för att mäta OP-tid (operation time). Ericssons huvudkontor ligger idag i Stockholm och är uppdelat i olika avdelningar, alla dessa avdelningar har cirka 10000 anställda tillsammans som är specialiserade inom sina områden. Fokus för denna tekniska rapport har varit att utreda frågor som vad innebär OP-tid samt finns det ett sätt att mäta OP-tider. Den avdelning som ligger i fokus för detta projekt tillverkar filter för radiobasstationer. Detta ska ses både ur ett ekonomiskt samt ingenjörsmässigt perspektiv. Denna undersöka ska ge en förklaring på vad OP-tiden innebär i ett testlabb samt att ge förslag på metoder att mäta OP-tid. Det som menas med testlabb är att operatörerna testar fram olika monteringsmetoder och filtret går igenom olika testprogram. Att kunna dra en gräns mellan OP-tid och övrig tid är en viktig faktor, tid är pengar och ingen vill stå för onödiga kostnader. Genom att fastställa "ren" OP-tid bortsett från alla problemområden, fås den faktiska kostnaden för produkten. I teoriavsnittet beskrivs Lean production samt JIT (just in time) och dess grunder. En volymverksamhet jämförs med en prototypverksamhet, detta görs för att förstå skillnaderna mellan dem och för att få fler idéer och tankar kring problemområdet.

Abstract [en]

The purpose of this technical thesis is to investigate different methods and tools to measure the OP time (operating time). Ericsson is headquartered in Stockholm,and is divided into different departments, these department’s together has approximately 10 000 employees who is specializedin their areas. The focus of this technical report has been to investigate the questions like, what is OP time, is there a way to measure the OP time.The Department that is the focus of this project produces filters for radio base stations. This should be viewed both from a financial and engineering perspective. This examine will give an explanation on what the OP time is in a test lab environment and to give suggestions on how to measure the OP time. Time is money which means that a separation between OP time and other time will lower the unnecessary costs. By establishing "clean" OP time apart from other time, obtains the actual cost of the product. In theory section Lean production and JIT (just in time) and its grounds will be described. The idea is to compare a volume business with a prototype business, and thereafter focus on the prototype business, specifically on its problem areas and solutions.

Place, publisher, year, edition, pages
2015.
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:oru:diva-46299OAI: oai:DiVA.org:oru-46299DiVA: diva2:865660
Subject / course
Mechanical Engineering
Supervisors
Examiners
Available from: 2015-10-29 Created: 2015-10-23 Last updated: 2017-10-17Bibliographically approved

Open Access in DiVA

No full text

By organisation
School of Science and Technology
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar

Total: 100 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf