To Örebro University

oru.seÖrebro universitets publikasjoner
Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Produktivitetsstudie Brobyggnad
Örebro universitet, Institutionen för naturvetenskap och teknik.
Örebro universitet, Institutionen för naturvetenskap och teknik.
2012 (svensk)Independent thesis Basic level (degree of Bachelor), 10 poäng / 15 hpOppgave
Abstract [en]

The development of productivity in the construction industry has long been at a steady state compared to the manufacturing industry. Studies have shown that, amongst other things, waste on construction sites can reach up to one third of the total production cost. This has been observed from different aspects, and change is forthcoming.

This thesis aims to provide a foundation for an increased productivity at production sites of building bridges. It is primarily based on a field study at Skanska, at a bridge construction site near Grängesberg. Via continuous interviews with the whole production crew, construction workers and management, information on interference and possibilities of improvement at the work site has been documented. Moreover, Lean has been studied and attention has been brought to simple methods and approaches that can contribute to an increase of productivity. The purpose of this thesis was to inform Skanska and its team of recurring disruptions and improvement prospects, and to suggest simple methods so that future projects can be run more profitably.

During the field study approximately ten disruptions have been documented, which directly interfered with the production. Most of these were due to different forms of communication failures. Late deliveries and reinforcement problems were the most common disorders. Furthermore, we have found room for improvement within the visual management, where resources and technology are available, but are not utilized to its fullest potential. In conclusion we analyzed and gave suggestions of simple methods for improvement using Lean as support, were tools like Five Why’s and SMART goals were used.

sted, utgiver, år, opplag, sider
2012. , s. 40
Emneord [sv]
Produktivitet, brobyggnad, produktion, lean, störningar
HSV kategori
Identifikatorer
URN: urn:nbn:se:oru:diva-23179OAI: oai:DiVA.org:oru-23179DiVA, id: diva2:529925
Fag / kurs
Construction Engineering
Uppsök
Technology
Veileder
Examiner
Tilgjengelig fra: 2012-06-28 Laget: 2012-05-31 Sist oppdatert: 2017-10-17bibliografisk kontrollert

Open Access i DiVA

fulltext(1166 kB)787 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 1166 kBChecksum SHA-512
007b26f069e4b8b1fad80346ad26fc73dbf528e2ae5385230e5ca29afeef91f7e4b53b7029ed3392c80662375e0568f02a879ecf0fec120a7b39772769b651d7
Type fulltextMimetype application/pdf

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 787 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 450 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf