Effektiviseradtidsplanering-Platsbaserad tidplanering och traditionell tidplanering
Örebro universitet, Institutionen för naturvetenskap och teknik.
Örebro universitet, Institutionen för naturvetenskap och teknik.
2014 (svensk)Independent thesis Basic level (degree of Bachelor), 10 poäng / 15 hpOppgaveAlternativ tittel
Location Based Scheduling and Traditional Scheduling (engelsk)
Abstract [sv]

Den svenska byggbranschen kan utvecklas inom en rad olika områden för att effektivisera

produktionstiden. Målet för produktionstidplanering är att skapa förutsättningar för ett bra

produktionsresultat vid varje enskild byggnation.

Gantt-schema används som planeringsverktyg sedan en lång tid tillbaka och ger en

överskådlig bild av vad som ska göras och när det ska göras. Det har både sina för- och

nackdelar. Dagens planeringsteknik erbjuder stora möjligheter till förbättring av helhetsbilden

av byggprojekt. Detta ger möjligheter att göra en tidplan utan glapp, luft och kollisioner. I

synnerhet kan tid sparas vilket ger en positiv inverkan på ekonomin och vinsten.

Vico Schedule Planner (V-SP) har studerats för att få en bild över hur programmet lämpar sig

för planeringsändamål. En tidplan för ett verkligt byggprojekt har genomförts i V-SP med

hjälp av information från projektets kalkyl och 3D-modell. Tidplanen har planerats i Flowline

som bygger på platsbaserad tidsplanering, men samtidigt visas planeringen upp i ett Ganttschema.

Att göra en tidplan i V-SP minskar risker, glapp, luft och kollisioner. En bättre

helhetsbild fås vilket gör att dessa problem blir uppenbara vid planeringen. Projektet kan få en

lönsammare och effektivare byggproduktionstid. En jämn resursplanering kan fås och detta

värdesätts högt.

Abstract [en]

The Swedish construction industry can develop a variety of things to efficiency production

time. The goal of production scheduling is to create conditions for good production results at

each building site.

Gantt scheduling has been used as a planning tool for a long time. The plan gives a clear

picture of what will be done and when it should be done. It has both its advantages and

disadvantages. Today’s technologies offer great opportunities for improvement of the overall

picture of the building project. This provides opportunities to make a schedule without

glitches, air and collisions. In particular, time can be saved which has a positive impact on the

economy and profits.

Vico Schedule Planner (V-SP) has been studied to obtain a picture of if the program is

suitable for planning. A timetable for a real project has been implemented in V-SP by aid of

information from the project calculations and 3D model. The schedule has been planned in

Flowline based on location based scheduling, but the Gantt schedule was also obtained.

Setting a timetable in V-SP reduces risks, glitches, air and collisions. A more complete picture

is obtained where these problems become apparent. The project can receive a more profitable

and efficient building delivery time. A steady resource use level can be obtained and this is

highly appreciated.

sted, utgiver, år, opplag, sider
2014. , s. 44
Emneord [sv]
Gantt schema, Flowline, Planering, Tidplan, Vico Software, Vico Schedule Planner, 4Dmodell
HSV kategori
Identifikatorer
URN: urn:nbn:se:oru:diva-38255OAI: oai:DiVA.org:oru-38255DiVA, id: diva2:759512
Fag / kurs
Construction Engineering
Veileder
Examiner
Tilgjengelig fra: 2014-10-30 Laget: 2014-10-30 Sist oppdatert: 2017-10-17bibliografisk kontrollert

Open Access i DiVA

Fulltekst mangler i DiVA

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric

urn-nbn
Totalt: 179 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf