Till Örebro universitet

oru.seÖrebro universitets publikationer
Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Public involvement in the planning process: EIA and lessons from the Örebro airport extension, Sweden
Örebro universitet, Institutionen för samhällsvetenskap. (Man-Technology-Environment Research Centre)ORCID-id: 0000-0003-4785-3388
2004 (Engelska)Ingår i: Environmental Science and Policy, ISSN 1462-9011, E-ISSN 1873-6416, Vol. 7, nr 1, s. 59-68Artikel i tidskrift (Refereegranskat) Published
Abstract [en]

Environmental impact assessment (EIA) has been developed to include techniques for involving the public in environmental decision making. Although there is evidence from the evaluation of EIA in many countries that these ambitions often fail, little research has been done on EIA from the viewpoint of the public or from a deliberative democracy perspective (a deliberative democracy creates high demands for participation and argumentation for all concerned). This paper discusses public involvement from the perspective of local residents and their possibilities for engaging in deliberative processes in varying arenas. A case study on an airport extension in Sweden is used as an illustrative example of more general questions of public objectives, means, strategies and influence that are raised in relation to public involvement in planning. When local residents find that the EIA process does not provide them with the tools necessary to make an impact, they may find other creative ways of acting, outside as well as within formal arrangements for public involvement. As shown by this case study EIA opens up an arena for deliberation between concerned parties, but which may then be closed by mechanisms that restrict public involvement and impact. However, there are many arenas for deliberation, both within the traditional representative system and through local protests—an important issue to address if we want to understand involvement (or non-involvement) in EIA from the viewpoint of the public as well as from a deliberative democracy perspective.

Ort, förlag, år, upplaga, sidor
Elsevier, 2004. Vol. 7, nr 1, s. 59-68
Nyckelord [en]
environmental impact assessment, public involvement, deliberative democracy, power, airport, Sweden
Nationell ämneskategori
Miljövetenskap Sociologi
Identifikatorer
URN: urn:nbn:se:oru:diva-104236DOI: 10.1016/j.envsci.2003.10.007ISI: 000188608400006Scopus ID: 2-s2.0-0346724686OAI: oai:DiVA.org:oru-104236DiVA, id: diva2:1737244
Tillgänglig från: 2023-02-16 Skapad: 2023-02-16 Senast uppdaterad: 2023-02-16Bibliografiskt granskad

Open Access i DiVA

Fulltext saknas i DiVA

Övriga länkar

Förlagets fulltextScopus

Person

Soneryd, Linda

Sök vidare i DiVA

Av författaren/redaktören
Soneryd, Linda
Av organisationen
Institutionen för samhällsvetenskap
I samma tidskrift
Environmental Science and Policy
MiljövetenskapSociologi

Sök vidare utanför DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetricpoäng

doi
urn-nbn
Totalt: 49 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf