To Örebro University

oru.seÖrebro University Publications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Flödeseffektivisering med hjälp av Lean inom legotillverkande verksamhet i CNC-miljö
Örebro University, School of Science and Technology.
2023 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Flow efficiency with help of Lean within contrac manufacturing operations in a CNC enviroment (English)
Abstract [sv]

Detta examensarbete grundar sig på Lean-filosofin och genomförs i samarbete med ett legotillverkande företag vid namn Gloab Konsult AB, som specialiserar sig i CNC-svarvning och precisionsslipning. För att mer i detalj kunna studera olika verktyg och metoder ifrån Leanfilosofin, är syftet med detta arbete att effektivisera en av Gloabs artiklar som går igenom hela deras produktion, från råvarulager till längdsvarv och robotstyrd-precisionsslipmaskin för att slutligen packas ner för leverans till kund, en M2-500. Arbetet börjar med att identifiera flaskhalsen samt de icke-värdeadderande moment (Leans 7+1 slöserier) i M2-500:as flöde med hjälp av en flödesanalys. Detta ledde till att ett spagettidiagram, en 5-varför, en SMED-analys samt ett fiskbensdiagram användes för att identifiera, samt reducera orsakerna till Leanslöserierna transport, rörelse, väntan och outnyttjad kompetens, men också för att effektivisera och reducera flaskhalsen i flödet. Förbättringsförslagen som presenteras innefattar att flytta närmare på råmaterialet, införskaffa ett nytt mellanlager, påbörja arbete med 5S, utbilda fler personal, samt tillämpa SMED på maskinen som utgör flaskhalsen i M2-500:as flöde.

Abstract [en]

This thesis is based on the Lean philosophy and is conducted in collaboration with a contract manufacturing company called Gloab Konsult AB, specializing in CNC turning and precision grinding. In order to study various Lean tools and methods in more detail, the purpose of this work is to streamline one of Gloab's products that goes through their entire production process, from raw material storage to length turning and robot-controlled precision grinding machine, and finally packed for delivery to the customer, an M2-500. The work starts by identifying the bottleneck and non-value-added activities (Lean's 7+1 wastes) in the flow of the M2-500, using a flow analysis. This led to the use of a spaghetti diagram, a 5-why analysis, a SMED analysis, and a fishbone diagram to identify and reduce the causes of Lean wastes such as transportation, motion, waiting, and unused skills, as well as to streamline and reduce the bottleneck in the flow. The proposed improvement suggestions include moving closer to the raw material, acquiring a new intermediate storage, implementing 5S, training additional personnel, and applying SMED to the machine that represents the bottleneck in the flow of the M2-500

Place, publisher, year, edition, pages
2023. , p. 44
Keywords [en]
Lean, SMED, fishbone diagram, Flow efficiency
Keywords [sv]
Lean, SMED, Fiskbensdiagram, Flödeseffektivisering
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:oru:diva-108867OAI: oai:DiVA.org:oru-108867DiVA, id: diva2:1803818
Subject / course
Mechanical Engineering
Supervisors
Examiners
Available from: 2023-10-10 Created: 2023-10-10 Last updated: 2023-10-10Bibliographically approved

Open Access in DiVA

Flödeseffektivisering med hjälp av Lean inom legotillverkande verksamhet i CNC-milj(2048 kB)89 downloads
File information
File name FULLTEXT01.pdfFile size 2048 kBChecksum SHA-512
62dd86e8de4c146594752fa474cda5bfda2899a5c87a4056c43c1a82954b6b9b7663aa49e9695f4ad871b2f09da02cae1ff08a608b17f11aa3e97740eeff43b2
Type fulltextMimetype application/pdf

By organisation
School of Science and Technology
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 90 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 161 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf